Recent Work

From Most recent, going back to 2014

Home / Keywords Steve Shelbyx + metal sculpturex + tree sharkx /

15. After a lot of filing and polishing the upper set of teeth have been silver-soldered into place.

15.jpg 16. Both sets of teeth installed. This had to be done while there was still access to the inside.Thumbnails14. Making the two sets of teeth from nickel-silver bar, rough cut with the band saw, then refined some with the belt sander.16. Both sets of teeth installed. This had to be done while there was still access to the inside.Thumbnails14. Making the two sets of teeth from nickel-silver bar, rough cut with the band saw, then refined some with the belt sander.16. Both sets of teeth installed. This had to be done while there was still access to the inside.Thumbnails14. Making the two sets of teeth from nickel-silver bar, rough cut with the band saw, then refined some with the belt sander.16. Both sets of teeth installed. This had to be done while there was still access to the inside.Thumbnails14. Making the two sets of teeth from nickel-silver bar, rough cut with the band saw, then refined some with the belt sander.
Author
Steve Shelby
Visits
4152

EXIF Metadata

Make
NIKON CORPORATION
Model
NIKON D60
DateTimeOriginal
2019:03:09 19:00:38
ApertureFNumber
f/4.2

0 comments